CICo 2020
Conference Management System
Main Site
Submission Guide
Register
Login
User List | Statistics
Abstract List | Statistics
Paper List
Presentation Video
Online Q&A Forum
Access Mode
Ifory System
:: Abstract ::

<< back

Analysis of Damage to The Induce Draft Fan Component at PLTU PT. XYZ
Wilarso1, Awang Surya1, Asep Saepudin1, Muhamad Ali Pahmi2

Sekolah Tinggi Teknologi Muhammadiyah Cileungsi


Abstract

Steam Power Plant (PLTU) is a type of power plant that is widely used by the State Electricity Company (PLN) to meet national electricity needs, which is expected to reduce dependence on Diesel Power Plants (PLTD). PT. Coal-fired XYZ with an installed capacity of 1x15 MW and a production target of 10 MW for utilities and 5 MW for wood processing had an Availability Hour of 82.9% and Unavailability of 17.1% during the January to December 2013 period. Unavailability of 17.1% occurred either due to disturbances, inspections, and improvements to the generating unit system. Based on field findings, an outage occurs due to damage to brush generator that has been discontinued so that it needs fabrication and causes downtime for 32 days and repetitive failure on the IDF (Induce Draft Fan) which is used by the plant maintenance team to move the bottom ash. To determine the actions to improve the performance of the generating unit, an analysis of the main causes of IDF damage, as well as financial losses arising. It is expected that the main cause of the outage in the generating unit system is expected to be found corrective measures to increase the reliability and productivity of the generating unit

Keywords: Steam Power Plant, Availability Hour, Unavailability, Improvements

Topic: Engineering and Technology

Plain Format | Corresponding Author (Wilarso Arso)

Share Link

Share your abstract link to your social media or profile page

CICo 2020 - Conference Management System

Powered By Konfrenzi Ultimate 1.832L-Build7 © 2007-2024 All Rights Reserved