MINE PLANNING FOR OVERBURDEN TARGET ACHIEVEMENT IN THE FIRST QUARTER OF 2024 AT PIT 3 PT BINA SARANA SUKSES PT TANJUNG ALAM JAYA JOBSITE BANJAR DISTRICT SOUTH KALIMANTAN
Alfandro William (a*), Dian Eka Aryanti (a), Mesias Citra Dewi (a), Novan Bagaskara (b)

a) Mining Technology Study Program, Bandung Energy and Mining Polytechnic Jalan Sudirman No. 623, Bandung 40211, Indonesia.
*ptppepb2019[at]gmail.com
b) PT Bina Sarana Sukses Jobsite PT Tanjung Alam Jaya, Banjar District, South Kalimantan Province, Indonesia


Abstract

PT Tanjung Alam Jaya plans to conduct mining activities in Pit 3 to extract coal from Seam A, Seam B, and Seam C. This area has dense vegetation and thick overburden material with a dip of 23-25 degree. The steep slope of the coal seam results in a high SR value as the mining deepens. The research method was conducted using quantitative method with primary data collection through field observation and secondary data from PT Bina Sarana Sukses and other sources. The data is processed and analyzed to determine the need for equipment and the planned mining design. The mining design for the first quarter of 2024 will start from the north area and widen to the south, following the strike direction of the coal seam. The design for the first quarter of 2024 Pit 3 is divided into three monthly sequence designs with a total overburden capacity of 2,264,048.21 BCM and 103,555.4 tons of coal, with an SR of 21.86 in accordance with the provisions of 115% of the production capacity of the equipment determined by the company. Equipment required for mining includes loaders and haulers, with a total of 3 loaders and 14 haulers. Overburden production capacity ranged from 621,160.89 BCM to 685,537.27 BCM for each three monthly sequence.

Keywords: mine planning, mine design, overburden, sequence, stripping ratio

Topic: Mining Engineering and metallurgy

Plain Format | Corresponding Author (Alfandro William)

Share Link

Share your abstract link to your social media or profile page

ICPMGET 2024 - Conference Management System

Powered By Konfrenzi Ultimate 1.832M-Build7 © 2007-2026 All Rights Reserved